D-Lite Fuji

Installing a D-Lite Fuji

Measure the Frame Length: Measure the length of the frame along the slope, then add 10 cm (eaves) to get the total sheet length. For example, if the frame extends 1.90 m, cut the sheet to 2 m.

Starting the Installation for D-Lite Fuji Start with a Full-Meter Sheet: Begin installation with a full-meter sheet and proceed in one direction. Position the Outer Edge with the Female Rib First: Start at the outer edge with the female rib (long end) to ensure proper overlap. Align the Rib Ends: Observe that the ends of the ribs differ on each side. Always overlap the female rib (long end) over the male rib (short end)
.• Male Rib: Shorter end.
• Female Rib: Longer end.

Installing D-Lock on D-Lite Fuji
• Place the D-Lock on the Rib Joints: Install the D-Lock only on the rib joints and secure it with screws.
• Screw Along the Purlin Line: Attach screws along every rib, following the purlin line.
• Middle Rib Installation: Secure the middle rib directly with screws onto the sheet.
• Align Rib Overlaps: When overlapping ribs, place the male rib (short end) on top of the female rib (long end). Then, place the D-Lock over the overlap and secure it with screws.
• Leave Space for Flashing: For the final rib, leave space between screws to allow installation of the flashing for the corner cover.

Continue Installation for the Entire Awning

Installation Guide Video for D-Light Fuji

Download

Brochures and install manuals (.PDF)

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.